Lock-N-Load®Powder Measure and Case Activated Powder DropLock-N-LoaPowder Measure and Case Activated Powder Drop
- 9 -ChapTer 2Case Activated Powder DropThe Case Activated Powder Drop helps make reloading faster and easier than ever before. It automatically acti
- 10 -Step 1: Assembling the Case Activated Powder Drop Rotor Arm Reinstall the Rotor with the handle side to the right (metering opening facing you)
- 11 -Step 2: Upper Bracket Assembly Slide the Upper Bracket Assembly onto the Powder Measure. Engage Drive Link Pin (#10) into the Rotor Arm Slot.
- 12 -Step 3: Drop Tube Installation Screw the Drop Tube (#16) into the bottom of the Powder Measure. Lubricate the exterior of the Drop Tube (#16) w
- 13 -Step 4: Installing the Case Activated Powder Drop (Lower Assembly) Screw the Measure Adapter (Lower Assembly) into the reloading press a coupl
- 14 -Fig. 4: Installation for the Case Activated Powder Drop (Lower Assembly).MEASURE ADAPTERPOWDER BUSHINGMEASURE ADAPTER
- 15 -Step 5: Final Powder Measure Assembly Insert the Powder Drop Tube (#16) into the lower assembly. (Refer to pg. 13) Connect the slot on the M
- 16 -Step 6: Case Activated Powder Drop Adjustments Insert a case into the shell plate at station 3 of your Lock-N-Load AP and operate the handle to
- 17 -bill of maTerialsItem No. Production Part Number Qty. Description1 392721 4 BHSCS 10-32 X 1.002 392708 2 MOUNTING CLAMP3 392710 1 ROTOR ARM4 3
- 18 -1234567891011121314152526914242121323222019181716*
- 1 -Table of ConTenTsChapter 1: Lock-N-Load Powder Measure PageOverview 4Step 1: Disassemble 4Step 2: Assemble 5Step 3: Operate and Adjustmen
05/15/2013 780306AP.O. Box 1848 • Grand Island, NE 68802-1848(308) 382-1390 • www.hornady.com
- 2 - Chapter 2: Case Activated Powder Drop PageOverview 9Step 1: Assembling the Case Activated Powder Drop Rotor Arm 10Step 2: Upper Bracket Asse
- 3 -ChapTer 1Hornady Lock-N-Load Powder MeasureInstructions
- 4 -Your Powder Measure has been treated with a rust preventative which must be removed before use. We recommend that you clean and degrease all meta
- 5 -To assemble:Reverse the procedure in the first five steps above.The Rotor and Body are very closely fit and must be properly aligned to reassemble.
- 6 - The Lock Nut and O-ring on the Metering Unit may be adjusted to provide tension on the thread of the Plunger, so as to allow setting it while no
- 7 -bill of maTerialsItem No. Production Part Number Qty. Description1 170405 1 HOPPER CAP2 398520 1 HOPPER3 392740 1 BODY4 392719 2 SCREW BHSCS 10-
Kommentare zu diesen Handbüchern